Tower cranes are the workhorses of high-rise and industrial construction. This guide explains the main types, the specifications that matter and what to check before buying a crane new or used.
No public offers yet. Post a request — sellers will offer machines from their stock.
Not enough priced offers yet to show a price range.
A tower crane carries its jib on top of a vertical tower, so it can serve an entire construction site and lift concrete buckets, formwork, rebar, precast panels and steel to any floor. Unlike a truck crane, it does not drive between sites: it is erected on a foundation or rails for months or years, runs on mains electricity and is built for intensive daily duty.
| Type | Key feature | Typical use |
|---|---|---|
| Self-erecting (bottom-slewing) | the whole tower slews; many unfold without an assist crane | low-rise housing, short jobs, frequent moves |
| Top-slewing hammerhead | only the upper part slews; jib held by ties from a tower head | the standard choice for multi-storey work |
| Flat-top | no tower head or ties | easier erection; several cranes can work at different heights |
| Luffing jib | radius changes by raising the jib | dense city sites, high-rise, heavy loads |
| Rail-mounted | travels on crane rails | long buildings and industrial sites |
| Tied-in and climbing | tied to or climbing with the building | high-rise construction |
Maximum capacity is available only close to the tower; at the jib tip the permitted load is usually several times lower. Compare cranes by the load chart for your jib length and reeving, and by load moment in tonne-metres. Many Chinese model names encode jib length and tip load: TC6013 means a 60 m jib and 1.3 t at the tip. Other key figures are the freestanding hook height (often 40–60 m, more when tied to the building), hoist, slewing and trolley speeds, two-fall or four-fall reeving (four-fall doubles the capacity at half the speed), transport dimensions and the power supply required.
Place the crane on the site plan so it covers the building, storage areas and unloading points. Check the heaviest lifts at their actual radius, then the height you need with a margin. Consider neighbouring buildings and power lines, the number of cranes on site, how often you will relocate, and the full cost of foundations, transport, erection and dismantling.
Check that the crane is complete (all tower sections, base, ballast, counterweights, ties, cab, electrics), that it has a Russian-language passport and documents, the remaining service life and any industrial safety review, cracks and repair welds in tower and jib sections, worn pin and bolt holes, slewing-ring play, winches, gearboxes and brakes, frequency drives and cabling, ropes, and all limiters and the data logger. Ideally inspect the crane erected and working. Prices depend on load moment, jib, height, completeness, brand, age and condition; current ranges are in the Prices block on this page.
Soviet and Russian KB-series cranes are common on the used market; Chinese makers include Zoomlion, XCMG, SANY and Yongmao; European brands such as Liebherr, Potain, Wolff, Jaso and Raimondi are now mostly sold used. A tower crane is not a vehicle, but it is a lifting structure under Rostekhnadzor rules: EAEU conformity documents (TR CU 010/2011) for new cranes, registration of a hazardous production facility and of the crane in most cases, erection by a specialised contractor to an approved project, inspection before commissioning and certified operators. Check the current requirements. Most companies finance tower cranes through leasing.
In many Chinese tower crane names the digits encode the jib length and the tip load: TC6013 has a 60 m jib and lifts 1.3 t at its tip. Always confirm the figures in the load chart of the specific model.
A self-erecting crane usually unfolds within hours. A large top-slewing crane typically takes several days to erect, plus the time to prepare the foundation and complete the paperwork for commissioning.
It can be, provided the crane comes with documents that allow it to be registered and operated in Russia, is complete, and has parts and erection crews available locally. Check all three before you agree on a price.
Documents for Buying Heavy Equipment in Russia: PSM, EPSM, Customs, Contract
What paperwork comes with a new or used machine in Russia: self-propelled machines versus road vehicles, customs and conformity documents for imports, the sale contract, VAT invoices and registration.
How to Inspect Used Heavy Equipment Before Buying
A practical inspection guide for buyers of used construction machinery in Russia: what to verify in the paperwork, how to check the engine, hydraulics, undercarriage and steel structure, and how to avoid the most common scams.
Heavy Equipment Leasing in Russia: How It Works and What It Costs
A plain-language guide to lizing, the Russian form of finance leasing, for buyers of construction machinery and for manufacturers who want their equipment to be easy to finance.
Post a request in two minutes. Dealers, importers and leasing companies will offer machines from their stock — many of them are not published on the site.
Most offers can be financed: advance from 10%, terms up to 60 months. Compare leasing companies and calculate the payment.